Kindia Bauxite Project
Kindia Bauxite Project: Full Overview
Background and Governance
Kada Gold Project
Project Summary
- Kada Project: Contiguous 101 km² land package (Kada & Bamfele permits) located along the N–S-trending Siguiri Mineralisation Trend.
- Massan Deposit (Flagship): Most advanced asset with a 2023 maiden MRE of 224 koz Indicated and 682 koz Inferred; mineralisation remains open along strike and at depth, with demonstrated down-dip continuity.
- Bereko Deposit: Under-drilled, currently 18 koz Inferred.
GAC's Boké Bauxite Project
The Guinea Alumina Company (GAC) Boké Bauxite Mine and Infrastructure Project represents one of the most ambitious and comprehensive mining developments undertaken in the Republic of Guinea in recent decades. Developed by Emirates Global Aluminium (EGA) through its subsidiary Guinea Alumina Corporation, this $1.4 billion venture has transformed Guinea's mining landscape, creating a fully integrated bauxite extraction and export operation that connects inland deposits to global markets through purpose-built infrastructure spanning mine, rail, and port facilities.